Visionnaire Collection
A Sculptural Oval in Patagonia Stone
Handcrafted in Foshan, the V65 unites book-matched Patagonia granite with a sculptural lacquered pedestal, transforming the executive table into a singular work of Italian-inspired artistry.
Design & Craftsmanship
The oval top is cut from a single slab of Patagonia granite, its cream, burgundy and oxidised-copper veining mirrored across the centreline in a flawless book-match, and finished with a flush bronze inlay that traces the perimeter with jeweller-like precision. Beneath, an amber-toned wood end cap softens the stone’s mineral drama, while the pedestal — fluted in sage on one face and sculpted in ivory lacquer on the other — rises in a flared, architectural silhouette that anchors the room with quiet authority.
Dimensions
| Width | 150 cm |
| Depth | 90 cm |
| Height | 75 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Executive offices and private studies
- Formal dining rooms and statement entrances
- Boardrooms, hospitality suites and private clubs
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




