ROSY ROSE Cross-Border Partnership · Est. 1983

B2B Cross-Border Partnership Process

Global distributors, wholesalers, furniture showrooms and project developers connect directly with the factory — cutting out every middleman.

Submit Your Inquiry & Start Partnering →

Why Global Distributors Keep Choosing ROSY ROSE

A 40-Year Foshan Source Factory · No Middlemen · True Ex-Factory Prices

A fully standardized B2B foreign-trade system aligned with global buying practices; 16 rigorous export inspections — zero ocean damage, zero shipping failures.

One-stop coverage for drawings, sampling, mass production, customs and logistics; fast response, dependable lead times, reliable after-sales and long-term mutual benefit; aesthetics and climate standards tailored to 125+ world markets.

1983Founded in Foshan
125+Export Countries
16QC Checkpoints
9Standard Partnership Steps

9 Standard Partnership Steps

The Complete Journey: From Inquiry to Long-Term Re-Orders

01

Inquiry & Precise Matching

Clients reach out via our website, WhatsApp, email or social channels, and our foreign-trade team responds within 24 hours. We first confirm the target country's aesthetic preference, procurement type (in-stock / mixed-container / full-container / OEM / ODM / contract custom), product categories, volume, budget and lead time, special material requirements and local climate suitability (moisture-proof, crack-resistant, dry-climate and temperature-swing tolerant). Our team then matches the product lines best suited to your market — high-repeat, high-margin options.

02

Information Kit & Product Selection

For B2B overseas distributors we provide a complete official commercial information kit, free of charge: a high-resolution digital catalogue of the full range, product parameters with materials, dimensions, weights and packaging, export certifications, factory credentials, real workshop photos, showroom visuals, past overseas partnership cases and re-order references from various countries. This enables quick product selection, range building, bundle planning and full-container allocation.

03

Quotation & Locked Pricing Structure

We issue a formal export quotation supporting EXW / FOB Foshan / CIF / DDP door-to-door. Every quotation is 100% transparent: unit ex-works price, material configuration, packaging standard, container fit, lead time, MOQ, payment terms and after-sales clauses. Three quotation systems apply: in-stock mixed batch (low MOQ, mixed-container support, flexible restocking), full-container bulk (best value at volume, higher margins) and OEM/ODM custom (private-label production, exclusive silhouettes and finishes). Prices are locked — no mid-order mark-ups, no hidden costs.

04

Drawing / 3D Approval + Physical Sampling

Custom, redesigned, OEM private-label and new-development orders move into sampling. Within 24 hours our engineering team completes the structural review and feasibility assessment, providing product structural drawings, 3D rendered visuals, leather colour cards, hardware samples and wood veneer panels. After your approval the factory produces pre-production samples that match bulk-production standards. Samples can be inspected by remote video or shipped for review. Core guarantee: once the sample is finalized, bulk production replicates it 1:1 — no shortcuts in materials, no changes in craftsmanship. The sampling fee is fully refunded once you place the formal order.

05

Contract Signing · Locked Lead Time & Quality

After both parties confirm the sample, price, lead time and configuration, we sign a formal foreign-trade purchase contract that clearly states all material, craftsmanship, dimension and colour standards, 16 quality-inspection checkpoints, the accurate production cycle and latest shipment date, payment terms, inspection standards and the damage-compensation mechanism, export packaging and ocean-transit protection standards, and structural warranty and after-sales clauses. Every partnership follows the contract as its governing document — a standardized, regulation-compliant transaction that protects overseas distributors.

06

Deposit Received · Production Scheduled

Once the 30% deposit is received, the factory immediately reserves the production line and schedules your run. Every overseas client is assigned a dedicated account-merchandiser who follows the order one-on-one throughout: incoming material verification, woodworking cutting and frame-building progress, upholstery sewing and finishing progress, and random-inspection records of semi-finished goods. Regular live photos and progress videos are sent during production, keeping your order fully transparent and traceable — no delays, no shortcuts in craftsmanship.

07

16 Quality Inspections · Pre-Shipment Final Check

Export furniture passes 16 rigorous inspection checkpoints. Each item is fully inspected stage by stage — from raw materials, semi-finished and finished goods through finishing, hardware, stitching, moisture content, flatness, structural integrity and packaging. A comprehensive pre-shipment final inspection follows: piece-by-piece verification against the approved sample, zero tolerance for colour deviation, damage, scratches or loose joints, moisture-content testing suited to ocean transit and varied climates, and full photo and video inspection — containers loaded only after your final confirmation.

08

Balance Settlement · Export Packaging + Full-Container Shipment

Once inspection passes, the balance is settled and export-grade professional packaging begins: furniture-grade vacuum moisture protection, reinforced edge protectors against impact, layered shock-absorbing foam, custom export cartons with reinforced strapping, and clear international shipping labels, container number and shipping marks. Professional container loading with internal bracing throughout eliminates ocean-transit damage. Full export documentation is issued at the same time — commercial invoice, packing list, certificate of origin, customs declarations and inspection reports. Full containers ship directly to ports in 125+ countries worldwide, with end-to-end tracking.

09

After-Sales Support · Long-Term Win-Win Re-Orders

Shipment is not where our partnership ends — it is where long-term mutual success begins. We provide B2B overseas distributors with enduring support: a long-term structural warranty on all furniture, free and fast replacement parts for the rare items damaged in transit, priority access to new product launches, price protection, territory protection and re-order discounts for long-term clients, plus year-round stable restocking and priority production scheduling. Most overseas clients grow from a single trial container into regular quarterly re-orders and annual key accounts.

Four Cooperation Models

Built for Every Overseas B2B Client

◆

In-Stock Mixed Batch

Low MOQ, mixed containers and flexible trial orders — ideal for new distributors and showroom restocking.

◆

Full-Container Bulk Supply

Best value at volume, ample margins and dependable lead times — for established wholesalers.

◆

OEM Private-Label Custom

Products customized to your brand, logo and packaging for a truly exclusive, own-brand range.

◆

ODM Original Co-Development

New models and exclusive silhouettes developed for your local market, securing your style advantage.

Backed by Factory Strength, Safeguarded by Standardized Process

Helping every global distributor sell with confidence, earn with stability and partner for the long run. Fill in the partnership form and our dedicated business team will reach out within 24 hours.

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp