Visionnaire Collection
A study in gridded leather, gilded accents and seamless bedside architecture.
Handcrafted in Foshan, this king platform bed unites precision-grilled taupe leather upholstery with a hand-finished gold metal frame and marble-effect back panel — its integrated nightstands delivering sculptural continuity and an unmistakably Italian sense of refinement to the principal bedroom.
Design & Craftsmanship
The oversized headboard is the centrepiece: a gridded matrix of deep-buttoned taupe leather, each panel tailored and tufted by master upholsterers to create a softly quilted topography that catches the light from every angle. The headboard flows without interruption into twin integrated nightstands, eliminating the need for freestanding bedside pieces while preserving generous surface space for reading lamps and personal objects. A slender hand-finished gold metal frame outlines the entire composition, while a marble-effect back panel rises behind the headboard to lend the suite its quiet sense of grandeur — all resting upon a low upholstered platform base that visually anchors the bed and reinforces its architectural calm.
Dimensions
| Width | 220 cm |
| Depth | 200 cm |
| Height | 120 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Principal bedroom suites within contemporary luxury residences
- Boutique hotel master rooms seeking a signature, integrated joinery statement
- Curated interiors inspired by Italian modernist glamour and tactile materiality




