Visionnaire Collection
A Sculptural Sanctuary in Charcoal and Gold
Handcrafted in Foshan, the V55 redefines the king platform bed as a study in restraint and drama — cloaked in deep charcoal velvet and traced with the quiet gleam of gold brass inlay lines.
Design & Craftsmanship
The V55 is built around a low, floating silhouette anchored by a hand-tufted headboard and base, where diagonal channel stitching carves sculptural ridges across the velvet surface. Slender brass inlays are integrated into the architecture of the frame, tracing the geometry of the channels and reflecting light against the charcoal weave. A polished gold-trimmed plinth lifts the entire bed from the floor, lending the generous king silhouette an unexpected sense of suspension.
Dimensions
| Width | 220 cm |
| Depth | 200 cm |
| Height | 120 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Master suites with a cinematic, contemporary mood
- Boutique hotel suites seeking a statement headboard wall
- Dark-palette interiors layered with brass accents and rich textures
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




