V53 Taupe Chevron-Lined Platform Bed

28 8 月, 2026

Visionnaire Collection

Architectural Chevron Detailing with Ambient LED Glow

Handcrafted in Foshan, the V53 is a king platform bed sculpted in warm taupe leather with dark contrast piping and a polished chrome foot — defined by its geometric chevron headboard and integrated LED ambient lighting that sets the mood of the entire room.

Design & Craftsmanship

The headboard and platform base are upholstered in supple taupe nappa leather, finished by hand with precisely cut chevron piping that traces sharp, repeating V-forms along every seam. A slender channel concealed behind the headboard casts a soft, indirect LED halo against the wall, while a sculptural chrome footpiece anchors the foot of the bed with quiet brilliance, completing the bed’s architectural silhouette.

Dimensions

Width 220 cm
Depth 200 cm
Height 120 cm

Customisation

Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.

Ideal For

  • Master suites with a contemporary Italian aesthetic
  • Hotel suites seeking a signature architectural centrepiece
  • Open-plan bedrooms where ambient LED lighting doubles as evening accent

Care & Warranty

Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp