Visionnaire Collection
A Sculpted Sanctuary in Taupe Leather
Handcrafted in Foshan, the V51 winged platform bed unites architectural poise with the quiet opulence of cream-taupe nappa leather, anchored by a diamond-tufted headboard and channel-stitched base that transform every bedroom into a private boudoir.
Design & Craftsmanship
The commanding winged headboard is meticulously hand-tufted in a classic diamond motif, each fold drawing the eye toward the contrasting dark brown leather insert framed by crisp, refined edge detailing. Beneath, the channel-stitched platform base flows in tailored horizontal lines, offering a soft, modern counterpoint to the sculptural crown above. Discreet low-profile metal feet lift the silhouette just enough to impart lightness, allowing the leather to read as the undisputed protagonist.
Dimensions
| Width | 220 cm |
| Depth | 200 cm |
| Height | 120 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Master suites in contemporary penthouse residences seeking a statement headboard wall
- Boutique hotel suites and luxury guestrooms requiring refined, photogenic comfort
- Designer-led renovations where a low-profile silhouette meets generous sleeping scale
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




