V48 Cream Barrel-Back Leather Chair

28 8 月, 2026

Visionnaire Collection

A Sculpted Barrel Silhouette in Ivory Leather

Handcrafted in Foshan, the V48 unites cream full-grain leather with dark walnut splayed legs and polished brass sabots in a sculptural barrel-back silhouette that anchors the room with quiet, Italian-inspired authority.

Design & Craftsmanship

The gently curved barrel back is finished with a precise centre channel seam that traces the spine of the chair, lending quiet architectural rhythm to its otherwise fluid form. Edges are hand saddle-stitched for a couture tailoring detail, while the seat rests on four tapered walnut legs tipped with brass sabots — a discreet flourish of old-world European atelier sensibility.

Dimensions

Width 48 cm
Depth 55 cm
Height 90 cm

Customisation

Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.

Ideal For

  • An elegant side chair beside a writing desk, vanity or bedside table
  • A statement accent flanking a console, fireplace or entryway console in a boutique hotel or private residence
  • An occasional seat at the head of a dining table or in a formal sitting room where sculptural seating is desired

Care & Warranty

Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp