V45 Two-Tone Grey Cantilever Chair

28 8 月, 2026

Visionnaire Collection

A sculptural cantilever chair dressed in a duet of greys.

Handcrafted in Foshan, the V45 marries cool grey and dove-grey Italian-style leather over a sweeping cantilevered sled base in brushed gold — a tub accent lounge chair engineered as much for posture as for presence.

Design & Craftsmanship

The V45 is sculpted as a continuous, cocooning tub silhouette, with a wraparound back-to-arm transition that reads as a single, uninterrupted arc. Its defining flourish is the diamond and triangular geometric quilting drawn across the inner backrest, executed by hand to bring rhythm and depth to the dove-grey leather. A two-tone upholstery treatment sets a cooler grey outer shell against the lighter inner lining, while the cantilevered sled base in brushed gold tubular steel lifts the form into a floating, modernist stance.

Dimensions

Width 82 cm
Depth 85 cm
Height 95 cm

Customisation

Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.

Ideal For

  • An executive study or private library corner, where its cantilevered poise doubles as desk-side seating.
  • A boutique hotel suite or upscale lounge, anchoring a reading vignette beside a sculptural floor lamp.
  • Statement placement in a contemporary living room, positioned opposite a fireplace or low-profile sofa.

Care & Warranty

Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp