Visionnaire Collection
A Sculptural Centrepiece Where Stone Meets Soft Geometry
Handcrafted in Foshan, the V40 unites a cream marble top with grey veining, ribbed beige fabric-clad pedestal columns and dark bronze framing into a refined round dining table crowned by an integrated rotating tray for effortless shared dining.
Design & Craftsmanship
The V40 is anchored by twin pedestal columns wrapped in fluted, ribbed beige textile, their vertical channeling lending a tailored, architectural rhythm to the composition. Crowning the table, a precision-engineered rotating tray in matching marble transforms the surface into a graceful stage for shared plates, while a dark bronze geometric base frames the structure with quiet authority, balancing the cool tactility of stone against the warmth of upholstered form.
Dimensions
| Width | 150 cm |
| Depth | 90 cm |
| Height | 75 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Formal dinner parties where the central lazy susan invites unhurried conversation and shared tasting menus.
- Family gathering rooms seeking a sculptural focal point that softens open-plan living with textile warmth.
- Private hospitality suites and executive dining rooms where statement craftsmanship meets functional elegance.
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




