Visionnaire Collection
A Sculptural Sanctuary in Mohair and Walnut
Handcrafted in Foshan, the V34 pairs cloud-soft cream mohair velvet with a dark walnut frame, its hand-carved twisted rope arms transforming a low lounge silhouette into a quiet statement of Italian-inspired artistry.
Design & Craftsmanship
The frame is sculpted from richly grained dark walnut, its open, crossed-leg base engineered for both visual lightness and enduring stability. Master carvers coil each armrest by hand into a sinuous rope motif, the rhythmic spirals playing against the tailored piping and seamless joinery of the upholstered shell. The result is a lounge chair that reads as sculpture from every angle, while cradling the sitter in feather-soft mohair.
Dimensions
| Width | 82 cm |
| Depth | 85 cm |
| Height | 95 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- A reading chair in a library, study or quiet morning corner
- A signature accent in a refined hotel suite, members’ lounge or boutique reception
- An intimate seating moment beside a fireplace or at the foot of a master suite
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




