Visionnaire Collection
A low-slung silhouette dressed in smoke-grey aniline leather and hand-quilted geometry.
Handcrafted in Foshan by ROSY ROSE master upholsterers, the V33 unites a seamlessly curved, low-profile shell in smoke-grey aniline leather with a dark metal four-point splayed swivel base — turning 360° of quiet motion into the signature gesture of the piece.
Design & Craftsmanship
Every centimetre of the V33’s shell is enveloped in hand-stitched diamond and triangular quilting, the panels meeting in flawless geometry that follows the chair’s seamless curved construction without visible seams. The supple smoke-grey aniline leather is selected for its soft, open-pore depth, allowing the tonal movement of grey into taupe to emerge naturally over time. Below, a dark metal four-point splayed swivel base anchors the silhouette, engineering smooth, silent rotation beneath the lounge’s grounded, low-slung form.
Dimensions
| Width | 82 cm |
| Depth | 85 cm |
| Height | 95 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- An intimate reading corner where the swivel base pivots effortlessly between bookshelf and window.
- A contemporary lounge or hotel suite, anchoring a low conversation grouping with sculptural presence.
- A private study or executive retreat, where the quilted shell and 360° rotation invite unhurried reflection.
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




