Visionnaire Collection
An Heirloom Wingback in Rust Wool and Honey Wood
Handcrafted in Foshan, the V30 commands attention with its rust wool-blend upholstery, honey wood armrests and sculptural splayed black legs — a quietly theatrical lounge chair that turns any corner into an Italian-inspired retreat.
Design & Craftsmanship
Sculpted in the spirit of Milanese mid-century design, the V30 rises into softly curved wing ears that frame the sitter like an embrace, while tailored piping traces every contour of the high back and seat with jeweller-like precision. The terracotta-toned wool-blend cloth is paired with warm honey wood armrests that flow seamlessly into a contrasting black frame, anchored by four splayed legs of architectural poise. Every joint, seam and stitch is finished by hand, ensuring a chair that reads as both sculpture and sanctuary.
Dimensions
| Width | 82 cm |
| Depth | 85 cm |
| Height | 95 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- A statement reading chair beside a low walnut bookshelf
- The corner anchor of a refined living room with neutral linen drapery
- An executive study or boutique hotel suite seeking warmth and gravitas
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




