V24 Antique Brass Nesting Round Tables

28 8 月, 2026

Visionnaire Collection

A Sculptural Trio in Marble and Brass

Handcrafted in Foshan, this trio of round nesting coffee tables unites veined marble and lustrous black lacquer with hand-patinated antique brass, arranging three distinct surfaces in a sculptural, tiered cascade that redefines the centre of a refined interior.

Design & Craftsmanship

Each tier reveals a different facet of luxury through its material: one crowned in dramatic black-and-grey veined marble, another dressed in deep mirror-polished black lacquer, and the third finished in paler white marble with delicate grey veining. Hand-patinated brass rims trace every edge with a softly

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp