Visionnaire Collection
An Architectural Centrepiece in Brass and Obsidian Glass
Handcrafted in Foshan with the precision of a jeweller and the eye of an architect, the V23 unites a slender brass framework, twin panels of black tempered glass, and deeply fluted dark side panels into a sculptural coffee table that crowns the modern salon with quiet Art Deco authority.
Design & Craftsmanship
A square silhouette of disciplined geometry, the V23 is built around a finely proportioned brass skeleton — slim in profile yet reassuringly solid underhand — that frames twin panes of black tempered glass set as the tabletop. The polished metal edges catch the light in elegant glints, while vertically ribbed side panels in deep espresso brown introduce rhythm and shadow, drawing the eye along their grooved surface. Every joint is hand-finished, every flute hand-aligned, so the piece reads as a single, cohesive object rather than an assembly of parts.
Dimensions
| Width | 120 cm |
| Depth | 70 cm |
| Height | 42 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Anchoring a contemporary living room with Art Deco or Hollywood Regency interiors
- Statement placement in a hotel lobby, executive lounge or private bar
- Adding a touch of gilded glamour to minimalist or neutral-toned reception spaces
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




