Visionnaire Collection
A Stratified Symphony of Marble, Brass and Velvet
Handcrafted in Foshan, the V19 unites three cascading marble surfaces, a sculptural brass pedestal and an integrated velvet ottoman into a single modular statement — an Italian-inspired composition that transforms the centre of the room into a stage for stone, silk and shine.
Design & Craftsmanship
Three hand-selected marble tops — veined in cream, dove grey and whisper-soft purple — float at staggered heights within a slender brass armature, their cool translucence balanced by the warmth of hand-lacquered burgundy panels below. A turned cylindrical brass pedestal anchors the composition, lending vertical grace to the otherwise horizontal silhouette. Tucked beneath the lowest tier, a plush dusty-pink velvet ottoman rises directly from the frame, offering a tactile counterpoint to the polished stone and a discreet invitation to linger.
Dimensions
| Width | 85 cm |
| Depth | 160 cm |
| Height | 85 cm |
Customisation




