Visionnaire Collection
A Drum of Stone and Brass, Guarded by a Lion
Handcrafted in Foshan with a hand-finished cream marble top edged in gold and resting on a sculpted brass pedestal, this round drum coffee table conceals a velvet-lined drawer behind a sculptural lion-head pull — a quietly commanding centrepiece for the most considered living rooms.
Design & Craftsmanship
The V16 reads as a single, monolithic drum — its taupe lacquered body curved in a continuous sweep and trimmed with a slender gold inlay that traces the circumference of the marble top. Each slab is selected for its veining, then hand-finished and bevelled to catch the light without glare. A jeweller-cast lion’s head in polished brass serves as the pull for a discreet, push-to-open drawer, while the flared pedestal beneath lifts the whole composition into a column worthy of a private salon.
Dimensions
| Width | 120 cm |
| Depth | 70 cm |
| Height | 42 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Centring a formal living room anchored by a pair of facing sofas, where the round form softens angular layouts.
- Concealing remotes, coasters and reading matter within easy reach, kept tidy behind the lion-head pull.
- An Art Deco or contemporary-glam interior seeking a sculptural statement piece in marble and brass.
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




