V11 Cream Leather Shelving Sectional

28 8 月, 2026

Visionnaire Collection

A Sculptural Sanctuary of Leather, Marble and Light

Handcrafted in Foshan, the V11 unites a deeply channel-pleated cream leather chaise with a cantilevered Emperador marble shelving console, forming an L-shaped sectional that reads as both lounge and library for the contemporary collector.

Design & Craftsmanship

The seat is upholstered in supple off-white nappa, drawn across vertical channel pleats that catch the light along every fluted line and lend the cushions a tailored, architectural rhythm. Plush loose back pillows soften the silhouette, while polished chrome framing traces the perimeter and rises into an integrated open shelving console clad in richly veined dark Emperador marble — a feature conceived for displaying objets d’art, folios or crystal decanters with gallery-like poise.

Dimensions

Width 260 cm
Depth 110 cm
Height 85 cm

Customisation

Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.

Ideal For

  • Anchoring the principal seating area of an open-plan penthouse, where the marble console doubles as a curated display against floor-to-ceiling glazing.
  • Furnishing a private library or executive study, offering both generous lounging space and an elegant surface for volumes, decanters and ceremonial objects.
  • Defining a luxury hotel suite or members’ lounge, where the channel-pleated leather and veined marble create an immediate sense of Italian-inspired refinement.

Care & Warranty

Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp