Visionnaire Collection
The V10 Loveseat in Taupe Aniline Leather with Bronze Sled Base
Handcrafted in Foshan, the V10 Loveseat pairs supple taupe full-grain aniline leather with a slim polished bronze sled base, its relaxed down-filled cushions and saddle-stitched seams delivering quiet Italian sophistication in a perfectly proportioned two-seater silhouette.
Design & Craftsmanship
The V10 is enveloped in taupe full-grain aniline leather, hand-finished to reveal the hide’s natural grain and the soft, warm depth unique to untreated surfaces. Saddle-stitch seam detailing runs with quiet precision along the arms and cushions, lending an equestrian-inspired refinement that softens the loveseat’s clean, square lines. Beneath, a slim polished bronze metal sled base lifts the entire form, giving the two-seater its signature sense of weightless ease and architectural poise.
Dimensions
| Width | 260 cm |
| Depth | 110 cm |
| Height | 85 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Intimate two-person seating in a master suite, study or refined city apartment
- Boutique hotel suites and executive lounges seeking a taupe leather loveseat of understated presence
- Contemporary interiors where warm grey-brown leather and bronze metal
✦ CONTINUE READING ✦




