Visionnaire Collection
A Sweeping Curve in Cloud-Soft Leather
Handcrafted in Foshan with the precision of Italian atelier tradition, the V09 marries a sculptural curved silhouette in top-grain aniline leather with an indulgent left chaise — a statement of quiet, modern luxury for the contemporary living room.
Design & Craftsmanship
The V09 is sculpted around a continuous, gently arcing back that invites the eye — and the body — to settle in. Hand-stitched horizontal channel tufting runs across each back cushion, lending rhythm and architectural definition to the cream aniline surface, while softly rounded pillow-edge construction gives the entire piece a buoyant, cloud-like presence. Grounded by slim dark tapered legs, the low-slung profile reads effortlessly elegant from every angle.
Dimensions
| Width | 260 cm |
| Depth | 110 cm |
| Height | 85 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Anchoring an open-plan living room where the curved silhouette becomes the focal point
- Lounging and entertaining in equal measure, with the left chaise offering a generous stretch-out zone
- Curated interiors seeking a light, sculptural seating statement in neutral palettes
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




