Visionnaire Collection
A cloud-shaped chaise sofa in hand-draped, full-grain leather
Handcrafted in Foshan, this low-slung extra-long modular sofa is upholstered in light beige full-grain leather and shaped into a soft, asymmetrical silhouette that turns generous interiors into sculptural sanctuaries of repose.
Design & Craftsmanship
Each panel of full-grain leather is hand-draped and gently folded across the frame, producing the relaxed, billowing contours that give the V08 its cloud-like presence. Deep button-pin-tucked cushions anchor the seat, while the extended chaise module curves outward in an organic, off-centre gesture — a low-profile composition engineered to envelop the body in quiet, unhurried comfort.
Dimensions
| Width | 260 cm |
| Depth | 110 cm |
| Height | 85 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Open-plan living rooms, penthouses and lofts with generous floor space
- Master-suite reading corners and extended chaise lounging zones
- Contemporary, gallery-style interiors seeking a sculptural centrepiece
Care & Warranty
Dust regularly




