Visionnaire Collection
A sculptural modular statement in warm taupe velvet
Handcrafted in Foshan, the V06 Taupe Velvet Couture Sectional pairs warm beige-taupe performance velvet with bronze metallic trim, couture-inspired architectural lines and an expansive multi-module layout for effortless entertaining and relaxed everyday living.
Design & Craftsmanship
Each generously proportioned module is shaped with tailored piping and framed by a slender bronze metallic trim, creating a refined silhouette with a distinctly couture presence. The low plinth floating base gives the sectional a poised, architectural stance, while the warm beige, taupe and mink palette brings softness and versatility to contemporary interiors.
Dimensions
| Width | 260 cm |
| Depth | 110 cm |
| Height | 85 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Creating a generous conversation area in an open-plan living room
- Entertaining guests with a flexible, modular seating arrangement
- Elevating contemporary interiors with a warm, sculptural focal point
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




