Art Deco Geometry, Royal in Precision
Milano presents a royal dining ensemble of rare material drama — a generous rectangular table whose high-gloss surface is inlaid with geometric marquetry of diamonds and stars in exotic woods, rising from a mirror-polished chrome pedestal. Its sculpted chairs unite Macassar-ebony veneer backs with ivory leather seats upon gleaming metallic frames. Made to order and priced for collectors, Milano brings the discipline of Art Deco to the world’s finest seven-star dining rooms.
Design & Craftsmanship
Milano’s tabletop is laid by hand with geometric wood marquetry, each diamond and chevron cut, matched and lacquered to a flawless piano depth, then set over a pedestal of mirror-polished stainless steel. The chairs pair rich Macassar-ebony backs with supple ivory full-grain leather, their frames joined and polished to a sculptural sheen. The effect is architectural and glamorous — a suite built for grand occasions and measured conversation.
Customisation
Every Rosy Rose piece is made to order as a private commission. Choose from our full range of sumptuous fabrics and leathers — velvet, bouclé, full-grain and nappa — and tailor the configuration, cushion firmness and finish to the exact measure of your residence.
Ideal For
- A formal dining room in a modern palazzo
- An executive or boardroom dining space of note
- A glamorous entertaining room in a designer home
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. The structural frame is covered by a 10-year warranty and upholstery by a 2-year warranty, with a lifetime refinishing service available on request.




