Magnolia Majestic Round-Marble Dining Suite

3 9 月, 2026

A Marble Crown on a Throne of Gold

Magnolia is a majestic round dining suite — a table of veined white marble borne upon a sculptural pedestal of polished gold, encircled by six cantilever chairs with curved enveloping backs in cream leather and deep emerald, their bases looping in gilded metal. A centrepiece of roses crowns the stone. Hand-built in our atelier and made to order, Magnolia is priced for collectors and finished for the world’s most celebrated seven-star dining rooms.

Design & Craftsmanship

Magnolia’s round top is cut from book-matched veined marble and set upon a faceted gold-metal pedestal, the polish of brass catching every candle. Each cantilever chair is upholstered in two tones — supple cream hide within and rich emerald leather without — over sculpted wooden shells mounted on continuous gilded loops that seem to float. The ensemble composes an intimate, radiant theatre for dining and conversation.

Customisation

Every Rosy Rose piece is made to order as a private commission. Choose from our full range of sumptuous fabrics and leathers — velvet, bouclé, full-grain and nappa — and tailor the configuration, cushion firmness and finish to the exact measure of your residence.

Ideal For

  • A round dining table as the centre of a grand dining room
  • A five-star hotel’s private dining salon
  • An intimate residential dinner setting of pure glamour

Care & Warranty

Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. The structural frame is covered by a 10-year warranty and upholstery by a 2-year warranty, with a lifetime refinishing service available on request.

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp