Fendi Collection
A romantic Hollywood Regency bed with button tufting and sculpted scrolled wings
Handcrafted in Foshan, this king-size upholstered bed wraps you in warm cream fabric with classic button tufting across its tall headboard. The sculpted scrolled wings feature contrasting woven panels with an intricate medallion motif, giving the silhouette a regal, throne-like presence. A clean low-profile platform base balances the ornate head with a contemporary, grounded finish.
Design & Craftsmanship
Diamond button-tufting on the main headboard panel creates soft, light-catching indentation, while the rolled wings curl outward as a signature traditional flourish. Textured grey-beige wing panels provide a subtle custom-contrast detail against the cream body. All-upholstered construction with no exposed frame delivers a soft, enveloping, romantic look.
Dimensions
| Width | 193 cm |
| Depth | 218 cm |
| Height | 142 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, bouclé, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Romantic master bedroom with vintage-inspired styling
- Hollywood Regency and transitional interior schemes
- Layering with salmon-pink throws and neutral bedding
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




