Fendi Collection
A complete suite with a dramatic two-tier wingback headboard and rose-gold detailing
Handcrafted in Foshan, this king-size upholstered bed arrives with two matching nightstands as a coordinated bedroom set. Its dusty teal upholstery, channelled centre panel and rose-gold metal trim evoke refined Art Deco glamour, while the tall two-tier wingback headboard creates an architectural focal point. A low-profile platform base keeps the sweeping lines clean and contemporary.
Design & Craftsmanship
The dramatic headboard combines a segmented upper panel with geometric rose-gold inlay and a channelled-tufted lower section, flanked by floating side wings for a framed, built-in look. Matching nightstands echo the theme with lacquered bodies and rose-gold-outlined drawers finished with brushed metal pulls. The coordinated suite delivers a symmetrical, hotel-quality presence.
Dimensions
| Width | 183 cm |
| Depth | 213 cm |
| Height | 152 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, bouclé, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Coordinated master bedroom set with matching bedside storage
- Art Deco and modern glamour interiors
- Styling with grey Euro pillows and copper-toned accents
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




