Fendi Collection
A sculptural statement in veined stone and mirror-gold, crafted to crown the dining room in quiet opulence.
Handcrafted in Foshan, this dining table unites a generously proportioned natural-marble top with architectural mirror-polished metal legs. The creamy ivory slab is washed in dramatic caramel, gold and charcoal veining that flows like brushwork across the surface. Its angular sled base lends a sleek, mid-century-meets-modern silhouette to the whole composition.
Design & Craftsmanship
The design pairs a thick, bevel-edged marble top with a pair of cantilevered sled legs that sweep up at each end in a continuous golden arc. An open, airy negative space beneath keeps the massive top feeling light and floating. The contrast between organic stone and industrial precision makes it a refined, show-stopping centerpiece.
Dimensions
| Width | 220 cm |
| Depth | 100 cm |
| Height | 75 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, bouclé, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Grand contemporary dining rooms and formal dinner settings
- Executive boardrooms and upscale office meeting spaces
- Hotel restaurants, lounges and high-end showroom displays
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




