Fendi Collection
A Slice of Rose Marble on Matte Bronze
Handcrafted in Foshan, this oval coffee table presents a natural pink-rose marble top with a raw, organic edge, set on four slender matte-bronze legs. The pairing of soft stone tones with dark metal creates a refined, gallery-like statement.
Design & Craftsmanship
Each top is cut from natural rose marble with a distinctive raw-edged profile that preserves the stone’s organic beauty. Slim matte-bronze legs splay outward for stability while keeping the silhouette light and floating.
Dimensions
| Width | 130 cm |
| Depth | 70 cm |
| Height | 40 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, bouclé, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Statement living room centrepiece
- Contemporary and Art Deco interiors
- Upscale lounge displays
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




