Bentley Collection
A Study in Charcoal Authority
Handcrafted in Foshan from supple charcoal-grey full-grain leather set upon a polished chrome base, the BD-17 channels the disciplined poise of a grand tourer into an executive swivel chair engineered for long, focused days at the desk.
Design & Craftsmanship
An angular faceted wraparound backrest rises to cradle the shoulders, sculpted to suggest motion even at rest. Integrated leather-wrapped arms flow seamlessly from the seat, while tonal contrast topstitching traces every seam, sharpening the chair’s architectural silhouette. A single plush cushion sits beneath you in full-grain hide, supported by a five-star polished chrome swivel base fitted with smooth-glide casters for considered movement across the boardroom floor.
Dimensions
| Width | 82 cm |
| Depth | 85 cm |
| Height | 95 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Private executive study or home office
- Boardroom or director’s suite
- High-end corporate workspaces and law firms
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




