Bentley Collection
An architectural bedroom suite inspired by the poise of a continental grand hotel
Handcrafted in Foshan for the Bentley Collection, the BD-15 unites a floor-to-ceiling cream leather headboard with high-gloss book-matched rosewood wings, slim vertical brass rod inlays and a pair of cantilevered nightstands — a fully integrated king-size suite conceived as a single sculptural statement for the principal bedroom.
Design & Craftsmanship
The three-panel headboard rises from floor to ceiling, its central register upholstered in supple ivory leather and traced with slim brass rod inlays that catch the light like a row of fine jewellery. Flanking wings are finished in deep rosewood, hand-selected and book-matched before being sealed beneath multiple coats of mirror-bright piano lacquer, with the warm orange-amber grain reading as a quiet accent against the cream centre. The king-size bed base extends seamlessly into two cantilevered nightstands — a single horizontal line of lacquered rosewood that appears to float, giving the suite its unmistakable hotel-suite presence.
Dimensions
| Width | 220 cm |
| Depth | 200 cm |
| Height | 120 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- The principal suite of a luxury penthouse or city residence, where the integrated headboard replaces the need for additional wall art.
- Boutique hotel and serviced-apartment suites seeking a turnkey king bedroom concept with built-in bedside storage.
- Statement master bedrooms in private villas where a single, architectural furniture piece is preferred over layered joinery.
<h3 class="




