Bentley Collection
A study in quilted refinement for the modern dining room
Handcrafted in Foshan, the BD-13 marries champagne-beige quilted leather with a piano-black lacquered frame, channeling the tailored elegance of grand-touring motoring into a refined dining silhouette.
Design & Craftsmanship
The backrest centres on a hand-stitched diamond-quilted panel framed by smooth leather, capped by a softly rolled top crest that nods to the sweeping lines of a luxury coupé. A seamless seat cushion with subtle seam detailing rests upon tapered, high-gloss black lacquered legs, each one polished by hand to a mirror finish that anchors the chair with sculptural poise.
Dimensions
| Width | 48 cm |
| Depth | 55 cm |
| Height | 90 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- The head-of-table seat in a formal dining room
- Pairing around a marble or dark walnut dining table as a matching set
- Occasional use as a statement side chair in a study, dressing room or hotel suite
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




