BD-10 Burl & Leather Round Dining Table

28 8 月, 2026

Bentley Collection

A Centrepiece of Couture Craftsmanship — Where Burl, Leather & Lazy Susan Converge

Handcrafted in Foshan, the BD-10 unites a lustrous dark burl wood surface with a diamond-quilted cream leather pedestal and an integrated rotating lazy susan, channeling the bespoke sophistication of a Bentley interior into the dining room.

Design & Craftsmanship

The circular top is finished in deeply figured dark burl wood, its swirling grain polished to a piano-gloss sheen, while a matching burl lazy susan rotates seamlessly at its centre, framed by polished rose-gold trim rings. Beneath, a sculptural pedestal is upholstered in cream nappa leather and meticulously hand-quilted in a classic diamond motif, anchored by a winged emblem medallion and a broad circular plinth base — a discreet nod to the coachbuilt heritage of the Bentley marque.

Dimensions

Width 150 cm
Depth 90 cm
Height 75 cm

Customisation

Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.

Ideal For

  • Intimate formal dinner parties where the lazy susan effortlessly shares plates and conversation across the table.
  • Executive private dining rooms and Bentley-inspired studies seeking a showpiece that doubles as functional art.
  • Circular seating arrangements of six to eight guests, where the rotating centre enhances both ritual and reach.

Care & Warranty

Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp