Bentley Collection
Where Cream Stone Meets Sculpted Bronze
Handcrafted in Foshan, the BD-08 unites a softly rounded travertine top with hand-finished faceted bronze legs, distilling the Bentley Collection’s signature poise into a refined centrepiece for the modern salon.
Design & Craftsmanship
The BD-08 is composed around a generous square top of beige travertine, its gently rounded corners revealing the stone’s quiet, organic veining in warm cream and sand tones. Beneath it, four tapered bronze legs rise with deliberate geometric poise, each face hand-brushed to catch the light in muted, faceted planes. The joint where metal meets stone is dressed and sealed by hand, allowing the two noble materials to meet in a single, uninterrupted silhouette that reads as both architectural and serene.
Dimensions
| Width | 120 cm |
| Depth | 70 cm |
| Height | 42 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Anchoring a formal living room conversation area in front of a deep, low sofa
- Gracing a private library, executive lounge or boutique hotel atrium
- Elevating a minimalist interior where natural stone and warm metal become the focal point
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




