Bentley Collection
A Mirror-Finish Centrepiece in Cognac and Chrome
Handcrafted in Foshan from a polished wood veneer top set atop a high-gloss lacquered body, the BD-06 channels Bentley-inspired continental glamour into a refined rectangular silhouette with a mirror-bright finish.
Design & Craftsmanship
Each tabletop is laid with a continuous run of horizontal wood grain veneer, ensuring the cognac or dark taupe tone flows unbroken across the surface before disappearing into softly rounded corners. Beneath the veneer, the body is sealed in twelve coats of hand-rubbed lacquer, polished to a glass-like reflection that catches and refracts the light of the room. A slim chrome inlay band traces the perimeter of the top, dividing warm timber from cool steel with the precision of a continental coupe’s trim line.
Dimensions
| Width | 120 cm |
| Depth | 70 cm |
| Height | 42 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Anchoring the conversation area of a contemporary open-plan lounge
- Serving as a low display plinth for curated art books and objets in an executive reception or study
- Elevating hotel suites and private members’ lounges with a quietly luxurious focal point
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




