Bentley Collection
The Bentley BD-02 Ivory Leather Lattice Sofa
Handcrafted in Foshan, this low three-seater is upholstered in smooth ivory-cream leather and finished with mustard-yellow lattice diamond-stitched accent cushions, its slim flared arms and splayed light-oak legs defining a quietly sculptural silhouette for the contemporary lounge.
Design & Craftsmanship
The Bentley BD-02 is shaped around a low, elongated profile anchored by tapered light-oak splayed legs that lift the frame and accentuate its horizontal poise. Slim flared arms, hand-piped in contrasting ivory, frame a deep single bench seat dressed with two square accent cushions covered in mustard-yellow leather and meticulously hand-finished in a diamond lattice pattern with central button tufting. Every seam, pleat and stitch is guided by Rosy Rose’s signature handcraft tradition in Foshan.
Dimensions
| Width | 260 cm |
| Depth | 110 cm |
| Height | 85 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Formal living rooms and refined open-plan lounges seeking a low, sculptural anchor piece.
- Boutique hotel suites and executive reception areas where quiet luxury sets the tone.
- Heritage-style apartments and study libraries paired with warm timber joinery and brass accents.
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




