Verdura Palatial Burl & Gold Dining Collection

3 9 月, 2026

State Dining in Emerald, Burl & Gold

The Verdura Palatial turns a private supper into an audience. A burl-walnut tabletop suspended on twin plinths of polished gold presides over chairs upholstered in emerald-green and ivory leather, their backs quilted in diamonds. Hand-built to order and finished by master artisans, Verdura is priced for collectors who understand that a great table is the throne room of a home.

Design & Craftsmanship

Verdura is composed around one virtuoso gesture: a book-matched burl-walnut surface, lacquered to a depth that reads like liquid amber, resting on two geometric plinths of mirror-polished gold. Around it, chairs are tailored in deep emerald leather on the outer shell and cream on the seat and inner back, each diamond-quilted in the tradition of the great European maisons, with sinuous embracing arms and dark lacquered legs. The alternation of cold gold and warm wood, of jewel-tone leather and ivory, builds the quiet tension of a formal dining room designed to be remembered.

Customisation

Every Rosy Rose piece is made to order as a private commission. Choose from our full range of sumptuous fabrics and leathers — velvet, bouclé, full-grain and nappa — and tailor the configuration, cushion firmness and finish to the exact measure of your residence.

Ideal For

  • a formal dining salon for state occasions and family feasts
  • a private dining suite reserved in a seven-star palace hotel
  • collectors who commission seating for eight in rare exotic veneer

Care & Warranty

Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. The structural frame is covered by a 10-year warranty and upholstery by a 2-year warranty, with a lifetime refinishing service available on request.

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp