Seven-star glamour in dove velvet and gold — a master bed of Art-Deco majesty.
Command the room the way a duchess commands a palace. Duchessa’s extra-wide headboard, sculpted in dove-grey velvet and threaded with brushed-gold inlays, sets a seven-star standard of glamour. Made to order as a private commission and hand-built in our Foshan atelier, the suite unites bed, matching velvet nightstands and bench in one radiant composition — the centrepiece of a master bedroom destined for the world’s finest hotels.
Design & Craftsmanship
Duchessa is velvet on an operatic scale. Diagonal channel tufting is carved by hand across an oversized headboard, its light-catching waves inset with slim gold metallic lines that echo the glittering art above. Matching dove-grey velvet dresses the platform footboard, fluted nightstands and upholstered bench, while sculpted gold legs lift every form. Soft curves married to disciplined tufting create an heirloom presence that is both glamorous and calm.
Customisation
Every Rosy Rose piece is made to order as a private commission. Choose from our full range of sumptuous fabrics and leathers — velvet, bouclé, full-grain and nappa — and tailor the configuration, cushion firmness and finish to the exact measure of your residence.
Ideal For
- Master suites styled for pure, confident drama
- Grand residences and penthouse principal rooms
- Five-star hotel suites conceived around one unforgettable bed
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. The structural frame is covered by a 10-year warranty and upholstery by a 2-year warranty, with a lifetime refinishing service available on request.




