Noce Imperial Sculptural Sofa Collection

3 9 月, 2026

An Imperial Italian-glam centrepiece of swirled burled walnut and cream leather, reigning over grand salon and palatial reception alike.

Noce is a palace-calibre seating suite built to command the world’s finest seven-star hotel lobbies and aristocratic grand salons. Hand-built in our Foshan atelier, the sculptural sofa is upholstered in smooth cream leather with diamond-quilted side wings, wrapped in a richly swirling dark burled-walnut frame traced by fine gold piping. A coordinated loveseat completes the imperial tableau, each curve flowing low and sculptural so the collection presides with quiet authority over any grand residence.

Design & Craftsmanship

Master artisans select and match rare burled-walnut veneers whose molten grain is finished in many coats of high-gloss lacquer, while the frame is hand-shaped into fluid, low-slung curves. Cream full-grain leather is padded over layered foam for a deep, enveloping sit, its outer wings dressed with precise diamond tufting that catches light like couture. Fine gold metallic piping traces the frame’s leading edge, a jewellery-like detail that draws the eye around the whole silhouette. Together with sculptural marble and gold coffee tables, the suite reads as a single statement of imperial glamour.

Customisation

Every Rosy Rose piece is made to order as a private commission. Choose from our full range of sumptuous fabrics and leathers — velvet, bouclé, full-grain and nappa — and tailor the configuration, cushion firmness and finish to the exact measure of your residence.

Ideal For

  • Grand salon and palatial drawing rooms
  • Boutique five- and seven-star hotel lobbies
  • Signature living spaces in penthouse and villa residences

Care & Warranty

Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. The structural frame is covered by a 10-year warranty and upholstery by a 2-year warranty, with a lifetime refinishing service available on request.

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp