V65 Patagonia Stone Executive Table

28 8 月, 2026

Visionnaire Collection

A Sculptural Oval in Patagonia Stone

Handcrafted in Foshan, the V65 unites book-matched Patagonia granite with a sculptural lacquered pedestal, transforming the executive table into a singular work of Italian-inspired artistry.

Design & Craftsmanship

The oval top is cut from a single slab of Patagonia granite, its cream, burgundy and oxidised-copper veining mirrored across the centreline in a flawless book-match, and finished with a flush bronze inlay that traces the perimeter with jeweller-like precision. Beneath, an amber-toned wood end cap softens the stone’s mineral drama, while the pedestal — fluted in sage on one face and sculpted in ivory lacquer on the other — rises in a flared, architectural silhouette that anchors the room with quiet authority.

Dimensions

Width 150 cm
Depth 90 cm
Height 75 cm

Customisation

Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.

Ideal For

  • Executive offices and private studies
  • Formal dining rooms and statement entrances
  • Boardrooms, hospitality suites and private clubs

Care & Warranty

Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp