Visionnaire Collection
A Sculptural Statement in Black Marble and Gilt
Handcrafted in Foshan, the V63 unites a black-and-gold marble surface with a biomorphic stingray-inspired silhouette and a bronze-finished leg, transforming the executive desk into a hand-finished statement of Italianate craftsmanship.
Design & Craftsmanship
The V63 draws its silhouette from the spread wings of a stingray, the tabletop curving outward in a single fluid gesture that softens the geometry of the workspace. Beneath the veined black marble rests a sculpted pedestal finished in textured hammered black lacquer, concealing discreet drawers for stationery, devices and the quiet rituals of work. A tapered bronze leg grounds the composition, its warm metallic patina meeting the lacquered body and the polished stone in a seamless, hand-finished transition of three noble materials.
Dimensions
| Width | 160 cm |
| Depth | 80 cm |
| Height | 75 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Private studies and executive home offices seeking a sculptural centrepiece
- C-suite boardrooms and directors’ suites within luxury corporate headquarters
- Boutique hotel suites, members’ clubs and penthouse libraries where form meets function
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




