V62 Cream & Suede Crested Executive Chair

28 8 月, 2026

Visionnaire Collection

A Throne of Quiet Authority

Handcrafted in Foshan, the V62 unites vertical channel-quilted cream leather and soft taupe suede atop a polished brass five-star base — an executive swivel chair crowned by a hand-embroidered monogram crest.

Design & Craftsmanship

The towering high back is hand-stitched in crisp vertical channels of ivory full-grain leather, forming a fluted silhouette that draws the eye upward to a softly rounded, suede-wrapped headrest. A discreet embroidered monogram crest anchors the centre of the back, lending the chair a heraldic, almost ceremonial presence. The exterior is clad in supple taupe suede, creating a quiet two-tone dialogue with the luminous leather interior, while the polished brass five-star caster base grounds the composition in cool, sculptural weight.

Dimensions

Width 82 cm
Depth 85 cm
Height 95 cm

Customisation

Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.

Ideal For

  • The principal’s private study or executive corner office
  • A statement seat within a refined library or reading alcove
  • The focal point of a luxury penthouse dressing room or salon

Care & Warranty

Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp