V61 Ivory Channel-Tufted Executive Chair

28 8 月, 2026

Visionnaire Collection

Channel-tufted ivory leather command chair with a sculpted wingback silhouette

Handcrafted in Foshan by our senior upholsterers, the V61 envelops its sitter in supple ivory nappa, its tall winged backrest and chromed five-star base conferring an unmistakable authority at the head of any desk.

Design & Craftsmanship

Soaring well above the shoulder line, the backrest unfurls into soft architectural wings that frame the sitter, while a deeply ribbed vertical channel panel runs down the inner back — each pleat hand-set to catch the light along its ivory grain. The armrests continue the same fluid wing-curve in a single uninterrupted sweep from seat to crest, cushioned in matched nappa and finished with a blind French seam. Beneath, a polished chrome five-star base pivots on silent twin-wheel casters, balancing the chair’s grand proportions with engineered poise.

Dimensions

Width 82 cm
Depth 85 cm
Height 95 cm

Customisation

Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.

Ideal For

  • The principal’s corner office or executive suite
  • A private study, library or refined home workspace
  • The head of the boardroom table in a directors’ chamber

Care & Warranty

Dust regularly with a soft cloth;

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp