Visionnaire Collection
A Throne of Tufted Grandeur
Handcrafted in Foshan, the V59 Capitonné Velvet Winged Bed marries champagne-beige tufted leather with a sculptural gold metallic mesh base, transforming the principal bedroom into a sanctuary of Italian-inspired grandeur.
Design & Craftsmanship
The commanding winged headboard is hand-tufted in the classic capitonné tradition, each diamond-shaped panel meticulously pinched and secured with deep-set buttons to create a richly dimensional surface that catches the light from every angle. Beneath the upholstered crown, a platform bed and integrated nightstand are anchored by textured metallic mesh base paneling finished in champagne gold, framed by hand-applied gold trim and accented with polished brass details. The result is a bed that reads as both architectural sculpture and intimate refuge — a piece conceived to anchor the most ambitious of interiors.
Dimensions
| Width | 220 cm |
| Depth | 200 cm |
| Height | 120 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Master suites in classical-modern residences seeking a true statement centrepiece
- Boutique hotels, suites and private members’ clubs curating Italianate glamour
- Interior designers commissioning a tailored focal point for principal bedrooms
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




