V57 Leather & Burl Bedroom Suite

28 8 月, 2026

Visionnaire Collection

An Italian-inspired sanctuary in leather and luminous burl

Handcrafted in Foshan, the V57 bedroom suite marries cream-toned nappa leather with book-matched burl veneer, its softly arched headboard and ambient LED detailing transforming the private chamber into a quietly theatrical retreat.

Design & Craftsmanship

The platform bed is centred on a gracefully cambered headboard, its hand-stitched leather panelling framed by a recessed LED strip that casts a warm, intimate glow across the bedside. Flanking the bed, the cantilevered nightstand bodies appear to float, their book-matched burl-wood drawer fronts meticulously aligned to reveal a single, mirror-image flourish of grain — a quiet celebration of the cabinetmaker’s art.

Dimensions

Width 220 cm
Depth 200 cm
Height 120 cm

Customisation

Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.

Ideal For

  • Primary suites in luxury residences and penthouses
  • Boutique hotel master bedrooms and presidential suites
  • Refined guest rooms in private villas and estate residences

Care & Warranty

Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp