Visionnaire Collection
Sculpted Serenity in Soft Greige
Handcrafted in Foshan, the V50 is a contemporary tub-back armchair upholstered in smooth greige fine-grain leather, defined by its seamless wraparound silhouette, tone-on-tone topstitching and slim splayed legs that bring gallery-clean minimalism to the modern interior.
Design & Craftsmanship
The V50 is composed around a single, unbroken gesture: the backrest flows in one continuous sweep into the armrests, forming an enveloping cocoon that is at once architectural and inviting. Fine-grain greige leather is tailored with discipline, finished with contrast tone-on-tone topstitching that traces the seat, shoulders and base seams with quiet precision. A four-leg stance of slim, gracefully splayed tapered timber lifts the volume off the floor, preserving the chair’s pure horizontal lines while introducing a delicate, almost weightless poise.
Dimensions
| Width | 82 cm |
| Depth | 85 cm |
| Height | 95 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- A reading nook or window alcove, where the wraparound back cradles an unhurried hour with a book.
- A statement accent in a neutral-toned living room, paired with a curved sofa and a low travertine table.
- A boutique hotel suite or executive lounge, offering guests a sculptural moment of calm in luxurious greige leather.
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




