Visionnaire Collection
A sculpted cocoon of cream leather, lacquered shadow, and gilded poise
Handcrafted in Foshan from supple ivory nappa leather framed in high-gloss black lacquer and tipped with brushed brass sabots, the V49 lounge chair channels the Italian art of vertical capitonné tufting into a curved, wing-like silhouette that wraps the sitter in quiet drama.
Design & Craftsmanship
The interior back is hand-tufted in deep vertical channels, the rhythmic piping sculpting a continuous fluted line that catches light along the cream leather. A wraparound backrest rises into soft wing-like curves, cradling the shoulders while the lacquered exterior shell frames the upholstery in a single unbroken arc. The contrast between ivory nappa and piano-black lacquer is sharpened by hand-polished brass foot caps, each sabot set to anchor the piece with measured, jeweller-like precision.
Dimensions
| Width | 82 cm |
| Depth | 85 cm |
| Height | 95 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Statement seating in a monochrome penthouse living room or reading salon
- An intimate conversation pair facing a fireplace or art piece in a boutique hotel lounge
- A vanity or dressing-room chair where its wing-like back becomes a private alcove
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




