Visionnaire Collection
A Sculptural Statement in Dusty Teal and Gilded Detail
Handcrafted in Foshan, the V47 fan-back lounge chair marries sumptuous smoke blue-grey velvet with hand-stitched gold piping and a sweeping channel-tufted backrest, transforming a single seat into the room’s quiet centrepiece.
Design & Craftsmanship
Sculpted around a fan-shaped silhouette, the backrest is finished with precise horizontal channel tufting that draws the eye upward and softens the chair’s architectural profile. A continuous thread of gold-tone piping traces every curve, framing the velvet in a discreet line of jewellery-like refinement. The piece is supported by slender silver legs, capped with polished metal tips that catch the light and ground the design with a cool, modernist flourish.
Dimensions
| Width | 82 cm |
| Depth | 85 cm |
| Height | 95 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- An accent seat in a formal living room or salon, positioned to anchor a reading lamp or console.
- A signature vanity or dressing chair, where the fan-shaped back becomes a flattering frame.
- A boutique hotel suite or master bedroom retreat, adding theatre to quieter, intimate corners.
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




