V34 Cream Mohair Rope-Arm Lounge Chair

28 8 月, 2026

Visionnaire Collection

A Sculptural Sanctuary in Mohair and Walnut

Handcrafted in Foshan, the V34 pairs cloud-soft cream mohair velvet with a dark walnut frame, its hand-carved twisted rope arms transforming a low lounge silhouette into a quiet statement of Italian-inspired artistry.

Design & Craftsmanship

The frame is sculpted from richly grained dark walnut, its open, crossed-leg base engineered for both visual lightness and enduring stability. Master carvers coil each armrest by hand into a sinuous rope motif, the rhythmic spirals playing against the tailored piping and seamless joinery of the upholstered shell. The result is a lounge chair that reads as sculpture from every angle, while cradling the sitter in feather-soft mohair.

Dimensions

Width 82 cm
Depth 85 cm
Height 95 cm

Customisation

Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.

Ideal For

  • A reading chair in a library, study or quiet morning corner
  • A signature accent in a refined hotel suite, members’ lounge or boutique reception
  • An intimate seating moment beside a fireplace or at the foot of a master suite

Care & Warranty

Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp