Visionnaire Collection
A Sculpted Silhouette in Oxblood and Brass
Handcrafted in Foshan, the V32 lounge armchair marries deep oxblood channel-tufted leather with gleaming brass sabre legs and a plush black velvet seat cushion, channeling the theatrical glamour of Italian modernist design.
Design & Craftsmanship
The V32 is anchored by hand-stitched vertical channel tufting that runs the full height of the backrest, sculpting the oxblood leather into a ribbed, light-catching rhythm. Sculpted curved arms flow seamlessly into polished brass sabre-style legs capped at the shoulders with matching metal ferrules, lending the chair its signature tapered, knife-edge stance. A single black velvet cushion rests against the upright back, softening the architectural lines with a quiet moment of contrast and tactility.
Dimensions
| Width | 82 cm |
| Depth | 85 cm |
| Height | 95 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Library studies and executive offices seeking a single statement seat
- Boutique hotel lounges, cocktail bars and members’ clubs with a vintage-glamour palette
- Living rooms anchored by dark walnut joinery, marble surfaces and warm brass accents
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




