V30 Rust Wool Wingback Lounge Chair

28 8 月, 2026

Visionnaire Collection

An Heirloom Wingback in Rust Wool and Honey Wood

Handcrafted in Foshan, the V30 commands attention with its rust wool-blend upholstery, honey wood armrests and sculptural splayed black legs — a quietly theatrical lounge chair that turns any corner into an Italian-inspired retreat.

Design & Craftsmanship

Sculpted in the spirit of Milanese mid-century design, the V30 rises into softly curved wing ears that frame the sitter like an embrace, while tailored piping traces every contour of the high back and seat with jeweller-like precision. The terracotta-toned wool-blend cloth is paired with warm honey wood armrests that flow seamlessly into a contrasting black frame, anchored by four splayed legs of architectural poise. Every joint, seam and stitch is finished by hand, ensuring a chair that reads as both sculpture and sanctuary.

Dimensions

Width 82 cm
Depth 85 cm
Height 95 cm

Customisation

Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.

Ideal For

  • A statement reading chair beside a low walnut bookshelf
  • The corner anchor of a refined living room with neutral linen drapery
  • An executive study or boutique hotel suite seeking warmth and gravitas

Care & Warranty

Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp