Visionnaire Collection
A Sculpted Heirloom in Scalloped Chenille
Handcrafted in Foshan, the V27 marries Italian-inspired silhouette with an exquisite fan-quilted chenille-jacquard in warm beige, taupe and champagne, finished by a polished metallic swivel base that transforms every seat into a quiet moment of theatre.
Design & Craftsmanship
Each panel of the V27 is hand-stitched into a flowing scallop-shell motif, a couture technique borrowed from haute upholstery that gives the exterior a sculpted, three-dimensional rhythm. The backrest is finished with precise vertical channel quilting, framing the lumbar cushion in tailored lines, while the low-slung seat cradles the body with generous depth. Beneath it all, a polished metallic swivel base rotates smoothly and silently, anchoring the armchair in a language of restrained glamour.
Dimensions
| Width | 82 cm |
| Depth | 85 cm |
| Height | 95 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- An intimate reading nook or private library corner where the swivel invites quiet repositioning throughout the day
- A master bedroom dressing chair, where the sculptural quilting reads as jewellery for the room
- A boutique hotel suite or formal sitting room, anchoring a conversation grouping with quiet, sculpted drama
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




